Project: VelocityXLRG   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Patrick Mayworm   -  
Project:   Velocity - XL/RG   -   VIEW REPORTS
Total Hours:1417
Total Flight Time:
Start/Last Date:Jul 28, 2001 - No Finish Date
Engine:Continental IO 550N
Propeller:Catto
Panel:Garmin
 
Friendly URL: https://eaabuilderslog.org?s=VelocityXLRG

Home or Last Project Picture

Feb 13, 2020     Bench Back and Spar Leveling - (8 hours) Category: Fuselage
Took apart bench back and the tube wrapped in aluminum foil stuck hard to the glass. It took me a while to get one of the backs (smaller one) free of the hinge tube. Will try to free the other back from the tube. Don't know if I can. I turned the plane around and removed the landing gear. Placed the fuselage on slides and leveled the plane (pitch and roll). Sanded the inside of the engine bulkhead and put the spar in and leveled the spar with the plumb laser level. Will glue the spar in tomorrow after I measure the tips of the spar from the nose.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.